Brief History of Development
In Feb. of 1953, Maanshan Iron Mining Plant was established
and Masteel recovered its production completely.
On Aug.11, 1958, Maanshan Iron & Steel Company
was founded.
On Sept.20, 1958 and on Oct.29, 1959, Chairman Mao
inspected Masteel.
On July 29, 1965,the first monolithic train wheel with
diameter 840mm was produced in Masteel, which ended
the long history of relying on imported train wheel
& tyre.
On Nov.5 of 1965, Masteel promoted the civilized operation
activity with the content of three cleanness, no leakage
in five aspects, one standardized line and Masteel was
honored as ¡°a flower of Jiangnan (south part of Yangtze)¡±
in China Metallurgical industry.
In 1986, nine medium-sized blast furnaces were evaluated
as the national super-grade blast furnaces at the national
metallurgical work convention.
On May 28, 1987, High-Speed Wire Rod Plant was founded
and came into production with annual capacity of 0.4
million tons, which was the first high-speed wire and
rod mill of world advanced level in China . The rolling
speed was 111m/s.
On Jun.12, 1991, premier Li Peng inspected Masteel.
On Nov.11, 1991, General Secretary Jiang Zemin inspected
Masteel.
On July 30, 1992, Masteel was ratified as national
super-large enterprise.
On Dec.1, 1992, the No.2 Steel Making Plant of Masteel
realized complete casting, rated the second place among
the ten complete casting workshop constructed during
the Eighth Five-Year Plan period.
On Sept.2, 1993, Masteel successfully undertook the
shareholding reform as one of first nine standardized
pilot enterprises and raised 6.4 billion RMB, which
offered abundant fund for its development. Masteel regrouped
and divided into Magang Holding Company and Maanshan
Iron & Steel Company Ltd.
On April 26, 1994, a 2500 cubic meter blast furnace
was built and came into production.
On May 13, 1994, National Foreign Trade and Economic
Committee ratified Masteel as a Sino-foreign limited
liability company.
On Aug.17, 1994, a new processing line of train wheel
and tyre with investment of 0.16 billion RMB came into
production.
On June 18, 1997, Masteel¡¯s train wheel and high speed
wire rod got the certificate of ISO9002 quality system.
On July 4, 1998, Masteel rolled the first H-Beam in
China, and China¡¯s first H-Beam line with annual output
of 0.6 million was established in Masteel.
On Sept.20, 1998, Masteel successfully regrouped. Magang
Holding Company was changed into Magang (Group) Holding
Company Ltd.
On Dec.18, 2001, Masteel hot rolling thin strip line
began its construction, which is the key project of
structure readjustment to iron & steel main business
during the national Tenth Five-Year Plan period. Masteel
began to march towards the target of becoming the super-large
enterprise group with ten million tons production capacity.
On the August, 2002, Masteel cold rolling thin strip
project started.
On March 18, 2003, high speed wire production line
in No.2 Steel Making Plant came into production smoothly.
On Oct.16, 2003, No.2 2500 cubic meter blast furnace
finished commissioning and came into production. It
symbolized Masteel¡¯s annual capacity of pig iron leaped
to new stage of 8 million tons.
On Oct.18, 2003, First hot rolled coil was successfully
rolled with the hot rolling thin strip production line,
which ended the history of no hot rolling coil production
in Anhui Province.
On Feb.28, 2004, First cold rolled coil was successfully
rolled with the cold rolling thin strip production line.
Cold rolling thin strip line was put into production
smoothly.
On March 20, 2004, First hot-dip galvanized coil was
successfully rolled with the hot-dip galvanizing coil
production line. .
|