1. 1958 before the founding
of company
In February of 1953, Maanshan Iron Mining was established,
and was renamed as Maanshan Iron Plant in that year.
On September 16, 1953, hot metal was produced from No.
2 blast furnace.
On March 9, 1958, liquid steel was produced form an electric
arc furnace of 1.5 tons.
On April 24, 1958, Mr. Zhu De, vice President inspected
Maanshan Iron Plant.
2. 1958~1978
On August 1, 1958, Maanshan Iron & Steel Company
was founded.
On September 20, 1958 and on October 29, 1959, Chairman
Ma Zedong inspected Masteel.
On October 22, 1989, Mr. Liu Shaoqi, Chairman of the
Standing Committee of the National People's Congress
inspected Masteel.
On December 19, 1958, the first quality steel product
was produced in a small steel-rolling workshop.
In May, 1962, the train wheel & tyre project started
its construction.
On July 29, 1964, the first monolithic train wheel with
diameter of 840mm was produced in Masteel, which ended
the long history of relying on imported train wheel & tyre. This train wheel & tyre project was
one of the four great achievements in China industry
field at that time, and the other three were Daqing
Oil, 100MN hydraulic press and atomic bomb.
In 1964, Masteel promoted the civilized operation activity
with the content of three cleanness, four without, no
leakage in five aspects, one line, and standardization.
Masteel was honored as “a flower of Jiangnan (south
part of the Yangtze River)”.
In September, Masteel merged its management with Maanshan
municipal government administration into one.
In March, 1973, Maanshan municipal government separated
its functions from enterprise management, and Maanshan
Iron & Steel Company was back.
On July 1, 1975, 2300mm medium plate rolling mill project
was put into production.
On February 7, 1977, the construction work in Washan
started. By the end of 1984, the capability of Washan
mining reached 5 million tons of iron ore.
3. 1979~1992
In December, 1979, Masteel was chosen as one pilot company
by Anhui provincial government for expanding the autonomy
of state owned enterprises.
On May 28, 1987, the first high speed wire rod production
line in China came into production with the rolling
speed of 11m/s.
On June 12, 1991, the Standing Committee of the Political
Bureau of the CPC Central Committee, State Council Premier
Li Peng inspected Masteel.
On November 20, 1991, the Standing Committee of the
Political Bureau of the CPC Central Committee, General
Secretary of the CPC Central Committee Jian Zemin inspected
Masteel.
4. 1993~1997
On September 20, 1993, Masteel undertook the shareholding
reform successfully. Maanshan Iron & Steel Company
was divided into Magang Holding Company and Maanshan
Iron & Steel Company Limited.
On December 3, 1993 and January 6, 1994, Masteel H shares
and A shares were listed in Hong Kong Stock Exchange
and Shanghai Stock Exchange respectively. Masteel was
regarded as “the first iron and steel share in China”.
Masteel was named by “International Finance Forum” from
London, UK as the most successful listing company in
global emerging stock markets in the year 1993.
On April 26, 1994, No. 1 blast furnace of 2500 cubic
meter was built and put into production, which was the
milestone of Masteel for its development towards large-scale,
automation and modernization.
5. 1998~
On July 4, 1998, the first H beam production line in
China was put into production.
On September 20, 1998, Magang Holding Company was changed
into Magang (Group) Holding Company Limited.
On December 18, 2001, Masteel’s projects led by thin
strip hot-rolling line and cold-rolling line for technical
innovation and structure adjustment in the Tenth Five-Year-Plan
period started construction.
In May, 2002, Masteel won successfully in responding
the anti-dumping case taken by the United States against
H beam from China, which was the first successful case
achieved by a Chinese iron & Steel enterprise for
responding the anti-dumping cases against China after
China entering into WTO.
On October 16, 2003, No. 2 blast furnace of 2500 cubic
meter was built and came into production. Since then,
Masteel’s annual production capacity reached to 6 million
tons.
On April 28, 2004, thin strip hot and cold rolling project
was put into production.
On November 24, 2004, the plan for technical innovation
and structure adjustment in the Tenth Five-Year-Plan
period got approval from State government.
On May 10, 2005, the projects in Masteel new area with
the annual production capacity of 5 million tons for
high quality strips started construction.
On August 11, 2005, the Standing Committee of the Political
Bureau of the CPC Central Committee, State Council Premier
Wen Jiabao inspected Masteel.
On September 1, 2005, the hot-rolled H beam produced
by Masteel won the title of “China Top Brand”. Maanshan
Iron & Steel Company Limited won the title of “Enterprise
for producing products of China Top Brand”.
On February 6, 2006, the Standing Committee of the Political
Bureau of the CPC Central Committee, Chairman of the
Standing Committee of the National People's Congress
Wu Bangguo came to inspect Masteel for the second time.
On May 12, 2006, Hefei Iron & Steel Company was
reorganized, and the company returned to making a profit
in that year.
On November 29, 2006, the separation transaction convertible
bonds of Masteel were listed successfully in Shanghai
Stock Exchange. Masteel was the first listing company
in China who issued separation transaction convertible
bonds in A share market.
On November 30, 2006, the annual production capacity
of Masteel surpassed 10 million tons.
On December 4, 2006, Maanshan Iron & Steel Company
Limited was awarded State-owned Enterprise Establish
“Four Good” Collective Leadership Advanced Institution.
On September 11, 2007, the train wheel produced by Masteel
won the title of “China Top Brand”.
On September 20, 2007, the projects in Masteel new area
came into production completely.
On November 20, 2008, the revamping projects for train
wheel production lines came into production, and the
annual production capacity of train wheel reached 1.1
million pieces.
In December, 2008, the annual production capacity of
Masteel reached to 18 million tons.
On July 3, 2009, the Standing Committee of the Political
Bureau of the CPC Central Committee, Chairman of the
Standing Committee of the National People's Congress
Wu Bangguo came to inspect Masteel for the third time.
|